Actually, got out side too early and didn't want to start pounding until 8 am, so I split logs for about 30 minutes. (Which was plenty, sheesh)
Since I only focused on putting in a single nail per joist while I was laying the floor down, I have to go back and hammer the rest of them in.
I could just eye ball where to put the nails but it's incredibly easy to miss a 2 inch stud for some reason. So I rigged up a string to guide me along.
Using the butted ends of the flooring, centered on the floor joists, I simply placed the line 1/4 inch off center of the joist I was nailing. The floor joists are 24 inches on center, so the math was easy, even for me.
It took me a little less than two hours to manually nail in five joists worth and then I ran out of nails. That was all I could accomplish as I was called out to a house being demolished to see if I could salvage anything...but that's a story for tomorrow.