The floor is quite soft in spots so I will need to pull the floor completely up to repair the floor joists. A level subfloor will be added at that time and old flooring will be mixed in with replacement flooring make a uniform surface.
We were amazed, but not surprised, as the floor was actually built up no less than 4 inches up the side of the bathtub.
No comments:
Post a Comment
Let me know what you think! Comments and suggestions are always welcome!